  • 空气净化工程设计需要zhu意shi么?
    来yuan:http://www.jnyhrs.com 浏lan:次 发布日期:2020-07-04
    空气净化工程设计需要zhu意shi么?净化工程是yi个整体,meiyi个huanjie秊ia獂i致检查,謍ui凶龊胢eiyi个xijie,才能让整个系统完shan,发hui大的价值。如何做好zhexie,以xia八大要dian需要bet体育xia载zhu意。
    What should be paid attention to in the design of air purification project? The purification project is a whole, and every link should be carefully checked. Only by doing well in every detail can the whole system be improved and brought into full play. How to do these well, the following eight points need our attention.
    1.净化系统
    1. Purification system
    室内祄u掌换低晨煞治猻hui平cengliu、chui直cengliu和乱liu。选择气liuxingshiyi则can照惯例,二则取决于房间的工作can数。
    Indoor air purification system can be divided into horizontal laminar flow, vertical laminar flow and turbulent flow. The choice of air flow mode is based on the Convention and the working parameters of the room.
    2.洁净工程的洁净度与换气次数
    2. Cleanliness and air change frequency of cleaning engineering
    房间的洁净度取决于单位时间的换气次数,因此慎密考虑房间的工作性质、以及sheng产工艺要求,再决定净化系统的技术can数。
    The cleanliness of the room depends on the ventilation rate per unit time. Therefore, the technical parameters of the purification system should be determined after careful consideration of the working nature of the room and the production process requirements.
    3.净化工程结构
    3. Purification engineering structure
    为liao保zheng气liu几乎不受干扰,就必须jin行结构设计,必要的谨慎可以fang止房间里任何地方的灰尘积累。
    In order to prevent the accumulation of dust in the room, the structure must be carefully designed to prevent air flow from accumulating.
    4.净化工程设紁in桨伏/div>
    4. Design scheme of purification project
    要确定设紁in桨福匦胂榷苑考涞墓ぷ餍灾室约捌渲械钠鴏iu条件jin行认zhen祄u悸恰7⒊玖看蟮某导洳灰薱ai用地面送风xingshi,洁净度要求gao的车间应尽可能yuan离其它车间。
    In order to determine the design scheme, it is necessary to carefully consider the working nature of the room and the air flow conditions in it. The workshop with large dust emission should not adopt the form of ground air supply, and the workshop with high cleanliness requirements should be as far away from other workshops as possible.
    5.净化cai料
    5. Purification materials
    作为洁净室顶peng,墙面和地板的cai料必须是不宜polie、不易沾颗粒,以及几乎不起尘的cai料,另wai根据房间不tong的工作条件,还必须考虑cai料的化学性能是否稳定。
    As the ceiling of clean room, the wall and floor must be made of materials that are not easy to crack, particles and dust. In addition, according to the different working conditions of the room, it is also necessary to consider whether the chemical properties of the materials are stable.
    6.净化工程中压力和气liu
    6. Pressure and air flow in purification engineering
    为liao保zheng房间的洁净度,必须fang止wai面污染气liujinru室内,要da到zhe个mu的,房间里必须保持正压。为liao获得所要求的房间压力,必须补充适当的新鲜空气。
    In order to ensure the cleanliness of the room, it is necessary to prevent the air pollution from outside into the room. To achieve this goal, the room must maintain positive pressure. In order to obtain the required room pressure, appropriate fresh air must be supplied.
    7.净化辅助设备
    7. Purification auxiliary equipment
    必要时还得安置yixie辅助设备:如新风kou祄u掌竤hi仪,ge断上的传递chuangdeng。zhexie设备必须适合房间的要求,并且必须zhen正liaojie其功能。
    If necessary, some auxiliary equipment should be installed, such as the air indicator of the new air outlet, the transmission window on the partition, etc. These devices must be suitable for the requirements of the room and must really understand its function.
    8.净化中人和物祄u刂劈/div>
    8. Control of human and material in purification
    人和物是洁净蕐e闹饕緔uan,因此必须充分控制,例如:在jinru净化房前,所有的人秊ia司幌低常晃蕹疽拢⑶乙邮芫换低彻δ艿幕窘逃Ⅻ/div>
    People and objects are the main dust sources of the clean room, so it must be fully controlled. For example, before entering the purification room, all people should go through the personal purification system, change the dust-free clothes, and receive the basic education on the functions of the purification system.
    9.净化工程给排shui和送风装置及电yuan
    9. Water supply and drainage and air supply device and power supply of purification project
    根据所要运行的车间,提供必须的给排shui装置,送风装置和电yuan,zhexie装置和所涉及的设备必须易于shi用和设计,tong时不得有bo于空气净化系统。
    According to the workshop to be operated, necessary water supply and drainage devices, air supply devices and power supply shall be provided. These devices and equipment involved must be easy to use and design, and shall not be superior to the air purification system.